Do you have a question about the Pivot and is the answer not in the manual?
Questions and answers
Will Longwitz
May 11, 2025
How do I connect the two foundations to one remote control
1 comments:
Mr. Anderson
May 20, 2025
To connect two Serta Pivot foundations to one remote control:
1. Unplug the control cable from Foundation A. 2. Plug the “A” output of the Y-Cable into Foundation A’s control port. 3. Remove both wired remote controls and set them aside. 4. Plug the “B” output of the Y-Cable into Foundation B’s control port. 5. Plug one of the provided hardwired remote controls into the “Control Input” side of the Y-Cable. 6. Store the spare remote control in a safe place for future use.
Parts List....................8 Frame Assembly Instructions..............8 Emergency Power Down Feature............10 Wired Remote Control................11 Joining 1 Remote Control To Multiple Foundations........12 Troubleshooting.................13 Warranty.................14 Warranty Information: Please see the warranty included in this manual. Serta Pivot™ Foundation ® Patent Pending CUSTOMER SERVICE: 800-695-2540...
SAFETY PRECAUTIONS WARNING! IMPORTANT SAFETY INSTRUCTIONS. PLEASE READ THESE INSTRUCTIONS THOROUGHLY BEFORE USING THIS PRODUCT. SAVE THESE INSTRUCTIONS! When using an electrical furnishing, basic precautions should always be followed, including the following: READ ALL INSTRUCTIONS BEFORE USING (THIS FURNISHING) DANGER: To reduce the risk of electric shock: Always unplug this furnishing from the electrical outlet before cleaning.
Page 4
SAFETY PRECAUTIONS WARNING: Risk of Injury: Keep children and pets away from extended head support (or other similar parts). WARNING: Risk of electric shock: Connect this furnishing to a properly grounded outlet only. See grounding instructions. GROUNDING INSTRUCTIONS: This product must be grounded. If it should malfunction or break down, grounding provides a path of least resistance for electric current to reduce the risk of electric shock.
Page 5
SAFETY PRECAUTIONS This product is for use on a standard 120-volt circuit, and has a grounding plug that looks like the plug illustrated in photo A (see Figure). A temporary adapter that looks like the adapter illustrated in photo B and C able to be used to connect this plug to a 2-pole receptacle as shown in photo B if a properly grounded outlet is not available.
Page 6
800-695-2540. SMALL CHILDREN AND PETS WARNING: After your Serta Pivot™ Foundation has been unboxed, immediately dispose of ® packaging as it can smother small children and pets. To avoid injury, children and pets should not be allowed to play on or under the bed.
Page 7
SAFETY PRECAUTIONS SAVE THESE INSTRUCTIONS: Your Serta Pivot™ Foundation has been designed to provide you with the reliable ® operation and durability you expect. This product has been inspected and tested prior to shipment. PRODUCT RATINGS: The lift motor in your Serta Pivot™...
Before discarding any packing materials, check the adjustable bed frame carton and verify the following items in the parts list are included: Serta Pivot™ Foundation ® PARTS LIST A. Wired Remote E. Allen Key (1) B. Mattress Retainer Brackets: (1) Left, (1) Right F.
Page 9
Briefly activate all functions on the wired remote (As shown in the above photo). control to verify that all of the features are operational. If your Serta Pivot™ Foundation does NOT operate, ® please refer to the Troubleshooting section beginning NOTE: Install mattress on the foundation. Installation on page 13 of this manual.
Emergency Power Down Feature Your Serta Pivot™ Foundation has an ® STEP 3 emergency lowering feature in the event that your Replace the battery cover. base is in the raised position and has lost power due to a power outage.
Wired Remote Control Operation Guide A. HEAD UP B. FLAT C. HEAD DOWN HEAD ADJUSTMENT (A, C) • Adjusts the head section to the desired positions. BED “FLAT” BUTTON (B) • Levels the bed to the flat position when the button is pressed and held.
Assembling Split Dual Serta ® Pivot™ Foundations (Foundation A and Foundation B) to be used together as a single King or California King system. NOTE: The use of “Foundation A” and “Foundation B” is for description purposes only and the beds will not actually be labeled “Foundation A”...
Troubleshooting In the event the fails to operate, investigate the symptoms and Serta ® Pivot™ Foundation possible solutions provided in the chart below: SYMPTOM SOLUTION • Verify the power cord is plugged into a working, grounded electrical outlet. A grounded, electrical Hand control LED will not illuminate or LED surge protection device is recommended.
Serta ® Pivot™ Foundation mechanical part(s)* found to be defective by the manufacturer, in its sole discretion to the original Purchaser. ® Manufactured by Reverie for Serta...
Page 15
Contact your dealer for warranty information on these items. BY THE TERMS OF THIS WARRANTY. E. Modification of the Serta Pivot™ Foundation without prior written ® consent by the manufacturer. To the extent permitted by law, this Limited Warranty does not include F.
Page 16
Serta Pivot™ Foundation Limited Warranty ® Register Online. For easy registration of your warranty visit www.reverie.com Please prepare a digital copy of your proof of purchase (invoice or sales receipt) when registering online. Manufactured by Reverie for Serta ® ®...
Need help?
Do you have a question about the Pivot and is the answer not in the manual?
Questions and answers
How do I connect the two foundations to one remote control
To connect two Serta Pivot foundations to one remote control:
1. Unplug the control cable from Foundation A.
2. Plug the “A” output of the Y-Cable into Foundation A’s control port.
3. Remove both wired remote controls and set them aside.
4. Plug the “B” output of the Y-Cable into Foundation B’s control port.
5. Plug one of the provided hardwired remote controls into the “Control Input” side of the Y-Cable.
6. Store the spare remote control in a safe place for future use.
This answer is automatically generated