14. Loosen the azimuth lock bolt and slowly rotate the antenna from side to side until
15. Set the antenna to the position where the readings are at their highest, and tighten
16. Loosen the elevation lock bolt and slowly rotate the antenna from side to side
17. Tighten the antenna in place and click End Alignment.
18. Click Reset and follow the reset procedure to allow the VSAT to go online.

3.4 Initial Boot-Up

3.4.1 Monitoring via the LCDs

After successfully assembling the ODU and antenna and pointing the antenna, the
IFL (coax) cables are connected to the VSAT as described in the previous section
and the power switch is turned on or the external power supply is plugged in. At this
point the LEDs on the VSAT (Figure 25) flash in accordance with Table 2.
SE VSAT Install and Monitor
May, 2007
Figure 24: Cross Pole Completed
you pass the maximum signal strength, as indicated on the screen and speaker.
the azimuth lock bolt.
until you pass the maximum signal strength, as indicated by the readings.
Figure 25: VSAT LEDs