3. RECEIPT OF INSTALLATION

 TO BE PERFORMED BY THE FITTER IN THE PRESENCE OF THE CUSTOMER.
Check that the gas type and pressure comply with the type of heater installed
(see rating plate)
Check that an individual valve is installed prior to each heater.
Check that the "XFR USER GUIDE" is displayed next to
the control unit, after being stamped by the installer.
Provide the customer with a copy of each XFR USER INSTRUCTIONS supplied in the product
boxes.
Indicate to the customer the locations of:
- valves.
- electric switches.
- control units.
Explain to the customer how all control units operate.
Plan the initial maintenance visit (1 year after start-up).