Installation; Hanging And Fixing - SBM AMC 12 Installers And Users Instructions

Modulating and condensing gas warm air heater
Table of Contents

Advertisement

3. INSTALLATION

3.1 Hanging and fixing

 Check that the support is solid enough.
 The warm air heater must apire and exhaust freely
 Keep sufficient distance between the heater and any
 The heater can be installed horizontally or with an angle of maximum 45°.
 Positioning possibilities
Standard bracket for AMC 12 to 39
orientable at 180° horizontally
Ref. SBM
5760007 WALL BRACKET AM12-29/AMC12-19
5760008 WALL BRACKET AM39-58/AMC29-39
The presence of any obstacle can conduct to an over-
Heating of the appliance.
obstruction, in connection with safety and access for
service and maintenance. Pay particular attention to
any flammable materials. Please take into account the possibility to open the door of the heater for
the necessary service and maintenance work.
• The units are provided with pieces of M10 threaded sockets as fixing points.
• AMC 12 and 19 models have 2 pieces of M10 threaded sockets in their centre on the top and
underneath the heater.
• AMC 29 and 39 have 2 pieces of M10 threaded sockets in their centre on the top and underneath
then 4 additional pieces of M10 threaded sockets on the top of the heater.
• AMC 48 and 58 models have 4 threaded sockets on the top and underneath.
• See the schemes above to see the dimensions.
• We recommend using the SBM suspension kits for a safe installation.
• Be sure that there is no mechanical tension on the different connections after installation.
Consult the "APPLICATION RESTRICTION" chapter page 4.
Designation
XR10-30
XR40-60
HR10-20
HR30-40
A
550
665
B
640
815
C
800
990
Design bracket for AMC 12 and 19
orientable at 180° horizontally
A
B
C
Ref. SBM
555 640 800
5760013 DESIGN BRACKETAM12-29/AMC12-19
665 815 990
12 à 29 : 500 min.
1 0 t/m 30 m in. 500 m m
39 à 116 : 660 min.
40 t/m 60 m in 660 m m
Designation
250 min.
7

Advertisement

Table of Contents
loading

Table of Contents