Trane ODYSSEY TTA 075 ED Installation Operation & Maintenance

Light commercial split system 5-20 tons

Advertisement

TTA-R407C-EN1113.indd 1
TTA-R407C-EN1113.indd 1
Installation
Operation
Maintenance
ODYSSEY
Light Commercial
Split System 5-20 Tons
TTA Model 50 Hz
Single Circuit;
Dual Circuit;
TTA 075 ED
TTA 150 ED
TTA 100 ED
TTA 180 ED
TTA 120 ED
TTA 200 ED
TTA 150 ED (New)
TTA 240 ED
April 2016
R407C
Manifolded Compr.;
Single Circuit (Hi-Eff)
TTA 150 ED0G
TTA 060 FD
TTA 180 ED0G
TTA 120 FD
TTA 200 ED0G
TTA 240 FD
TTA 240 ED0G
TTA-R407C-EN1113
12-Sep-16 13:28:22
12-Sep-16 13:28:22

Advertisement

Table of Contents
loading

Summary of Contents for Trane ODYSSEY TTA 075 ED

  • Page 1 Installation R407C Operation Maintenance ODYSSEY Light Commercial Split System 5-20 Tons TTA Model 50 Hz Single Circuit; Dual Circuit; Manifolded Compr.; Single Circuit (Hi-Eff) TTA 075 ED TTA 150 ED TTA 150 ED0G TTA 060 FD TTA 100 ED TTA 180 ED TTA 180 ED0G TTA 120 FD TTA 120 ED...
  • Page 2: Model Nomenclature

    Model Nomenclature B = Mirror Design Sequence 060 = 60 MBH S = New Design 1 Fan/New comp change R = Fourth Design Sequence R407C (Hi-Eff) TTA-R407C-EN1113 TTA-R407C-EN1113.indd 2 TTA-R407C-EN1113.indd 2 12-Sep-16 13:28:22 12-Sep-16 13:28:22...
  • Page 3: Table Of Contents

    Contents Model Nomenclature General Information Installation Refrigerant Piping Guidelines Refrigerant Charging and Evacuation General Data Refrigerant Circuit Electrical Wiring Dimensional Data Operation Maintenance Maintenance Log Trouble Shooting TTA-R407C-EN1113 TTA-R407C-EN1113.indd 3 TTA-R407C-EN1113.indd 3 12-Sep-16 13:28:23 12-Sep-16 13:28:23...
  • Page 4: General Information

    General Information This manual covers the installation of Installation Checklist Inspection Checklist the TTA060, TTA075, TTA100 and An “Installation Checklist” is provided To protect against loss due to TTA120 (Single Circuit), TTA150, at the end of the installation section damage incurred in transit, complete TTA180, TTA200 and TTA240 (Dual of this manual.
  • Page 5: Installation

    Installation Lifting Recommendations Clearances Before preparing the unit for lifting, Provide enough space around the estimate the approximate center of unit to allow unrestricted access gravity for lifting safety. Because of to all service points. Refer to unit placement of internal components, dimensional data for minimum the unit weight may be unevenly required service and free air...
  • Page 6: Refrigerant Piping Guidelines

    Notes: 1. Two line sets are required for dual circuits units. 2. For line lengths over 80 linear feet and 15 feet liquid line riser, C. Recommended line sizes: consult your local Trane representative. TTA060FD (Single Circuit) TTA075ED (Single Circuit)
  • Page 7 Refrigerant Piping Guidelines Refrigerant Piping Procedures All brazing should be done using 2 1. Remove both seal caps from the to 8 psig dry nitrogen purge flowing indoor unit connection stubs. (Outdoor units) through the pipe being brazed 9 Each TTA unit ships with dry nitrogen (Figure 2).
  • Page 8: Refrigerant Charging And Evacuation

    Refrigerant Charging and Evacuation (R407C) System Evacuation 1. After completion of leak check, evacuate the system. 2. Attach appropriate hoses from manifold gauge to gas and liquid TTA 060 FD 11.2 line pressure taps. TTA 120 FD 18.7 TTA 240 FD 16.0 37.4 Note: Unnecessary switching of...
  • Page 9 Refrigerant Charging and Evacuation Recommended Charging Amount Caution Liquid Charging After the refrigerant pipework system • R407C charge in liquid phase only. has been pressure tested and • Always evacuate air from the tubing evacuated, the refrigerant may be before adding refrigerant. charged as follows.
  • Page 10: General Data

    General Data 34.80 1.20 / 3.40 TTA-R407C-EN1113 TTA-R407C-EN1113.indd 10 TTA-R407C-EN1113.indd 10 12-Sep-16 13:28:23 12-Sep-16 13:28:23...
  • Page 11 General Data 25.20 27.08 31.45 1.20 / 3.40 1.20 / 3.40 1.20 / 3.40 TTA-R407C-EN1113 TTA-R407C-EN1113.indd 11 TTA-R407C-EN1113.indd 11 12-Sep-16 13:28:23 12-Sep-16 13:28:23...
  • Page 12 General Data TTA150ED TTA180ED TTA200ED TTA240ED 32.50 38.40 45.60 48.98 R407C R407C R407C R407C BRAZE BRAZE BRAZE BRAZE 1 5/8 (41.3) 1 5/8 (41.3) 1 5/8 (41.3) 1 5/8 (41.3) 5/8 (15.9) 5/8 (15.9) 5/8 (15.9) 5/8 (15.9) 1.1/8 (28.6) 1.3/8 (34.9) 1.3/8 (34.9) 1.3/8 (34.9)
  • Page 13: Refrigerant Circuit

    Refrigerant Circuit Refrigerant Circuit TTA060-120FD TTA075-120ED TTA150ED (New) (Single Circuit) TTA150-240ED (Dual Circuit) Figure 4 Refrigerant Circuit TTA240FD TTA150-240ED0G TTA180-240ED0G (Manifolded Compressor) Figure 5 TTA 060 FD 380-415/3/50 342-440 10.31 7.4 / 56 1.06 / 2.27 TTA 120 FD 380-415/3/50 342-440 22.12 16 / 110...
  • Page 14: Electrical Wiring

    Electrical Wiring Electrical Wiring Ground the unit according to local Warning: Open the electrical codes and provide flexible conduit if disconnect switch and lock in open TTA field wiring consists of providing codes require and/or if vibration position to prevent accidental power power supply to the unit, installing the transmission may cause noise application.
  • Page 15 Electrical Wiring TTA-R407C-EN1113 TTA-R407C-EN1113.indd 15 TTA-R407C-EN1113.indd 15 12-Sep-16 13:28:23 12-Sep-16 13:28:23...
  • Page 16 Electrical Wiring TTA-R407C-EN1113 TTA-R407C-EN1113.indd 16 TTA-R407C-EN1113.indd 16 12-Sep-16 13:28:23 12-Sep-16 13:28:23...
  • Page 17 Electrical Wiring TTA-R407C-EN1113 TTA-R407C-EN1113.indd 17 TTA-R407C-EN1113.indd 17 12-Sep-16 13:28:23 12-Sep-16 13:28:23...
  • Page 18 Electrical Wiring TTA-R407C-EN1113 TTA-R407C-EN1113.indd 18 TTA-R407C-EN1113.indd 18 12-Sep-16 13:28:23 12-Sep-16 13:28:23...
  • Page 19: Dimensional Data

    Dimensional Data TTA060FD TTA075/100/120ED TTA150ED (New) VERTICAL DISCHARGE TTA060FD 1060 1060 1050 1 1/8" 1/2" TTA075ED 1060 1060 1050 1 1/8" 1/2" TTA100/120ED 1060 1060 1050 1 3/8" 1/2" TTA150ED (New) 1060 1260 1250 1 5/8" 5/8" TTA-R407C-EN1113 TTA-R407C-EN1113.indd 19 TTA-R407C-EN1113.indd 19 12-Sep-16 13:28:23 12-Sep-16 13:28:23...
  • Page 20 Dimensional Data TTA060FD TTA060FD 1060 1 1/8" 1/2" TTA075ED 1060 1 1/8" 1/2" TTA100/120ED 1060 1 3/8" 1/2" TTA-R407C-EN1113 TTA-R407C-EN1113.indd 20 TTA-R407C-EN1113.indd 20 12-Sep-16 13:28:23 12-Sep-16 13:28:23...
  • Page 21 Dimensional Data TTA120/240FD TTA150/180/200/240ED TTA120FD 1 3/8" 1/2" TTA240FD 1 3/8" 1/2" TTA-R407C-EN1113 TTA-R407C-EN1113.indd 21 TTA-R407C-EN1113.indd 21 12-Sep-16 13:28:23 12-Sep-16 13:28:23...
  • Page 22 Dimensional Data TTA120/240FD TTA150/180/200/240ED0G TTA120FD 1 3/8" 1/2" TTA240FD 1 5/8" 5/8" TTA-R407C-EN1113 TTA-R407C-EN1113.indd 22 TTA-R407C-EN1113.indd 22 12-Sep-16 13:28:23 12-Sep-16 13:28:23...
  • Page 23: Operation

    Operation ❏ Inspect unit location for proper Sequence of Operation Safety Controls Note: All of these controls may not be required service clearances. General ❏ Inspect unit location for proper free installed on your unit, check electrical Operation of the system cooling schematic.
  • Page 24: Maintenance

    Maintenance Maintenance • Inspect the evaporator and • Remove any accumulation of dust condenser coils for dirt and debris. and/or dirt from the unit casing. Perform all of the indicated If the coils appear dirty, clean them. • Remove corrosion from any surface maintenance procedures at the •...
  • Page 25: Trouble Shooting

    Trouble Shooting Table 9: Troubleshooting Chart Refrigerant Circuit Liquid overfeeding (expansion valve) (cap tube) f l i or no cooling/heating Electrical Compressor and outside fan won’t start Compressor will not start but outside fan runs Outside fan won’t start Compressor hums but won’t start Compressor cycles on internal overload...
  • Page 26 Trouble Shooting Safety recommendations Maintenance contract Training To avoid accidents and damage, the It is strongly recommended that you The equipment described in this following recommendations should be sign a maintenance contract with your manual is the result of many observed during maintenance and local Service Agency.
  • Page 27 Note TTA-R407C-EN1113 TTA-R407C-EN1113.indd 27 TTA-R407C-EN1113.indd 27 12-Sep-16 13:28:23 12-Sep-16 13:28:23...
  • Page 28 Trane Stocking Location: Bangkok, Thailand www.trane.com For more information, contact your local district Trane has a policy of continuous product and product data improvement and reserves the right to change office design and specifications without notice. TTA-R407C-EN1113.indd 28 TTA-R407C-EN1113.indd 28...

Table of Contents