Greenheck Vektor-M Compact ERS Installation, Operation And Maintenance Manual page 5

Energy recovery system laboratory exhaust
Table of Contents

Advertisement

Plenum Service and Access Locations
• Sizes 20, 25, 30, 35, 40, 60
Standard M series and C series ERS plenum
cabinets require minimum clearances for access
on three sides for routine maintenance. Filter
replacement, drain pan inspection and cleaning,
coil inspection, damper actuator adjustments and
inspection are examples of routine maintenance
that must be performed. Coil and filter sections
are always provided with a service door or panel
for proper component access. Clearances for
component removal may be greater than the
service clearances. Refer to page 15 for coil
clearances.
®
Used on page 5 of Part #474118 - need to copy, and edit this same drawing for use on backcover of same Instruction.
Lift
Brackets
Optional
External
Piping
(by others)
Optional
Internal
Piping
(by others)
under
Vektor fans
Used on backcover of Part #474118
Service Doors
Coil Service
Clearance
Vektor-ERS Energy Recovery Plenum Laboratory Exhaust
Side or Bottom Intake Opening
Coil
Coil
Vektor-M ERS Standard
Coil
Coil
Vektor-C ERS
Filters
Service Doors
Internal Pipe
Chase
Bypass
Weatherhood(s)
Vektor bypass
air plenum
optional mounting
locations shown
Coil Service
Clearance
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vektor-m standard ersVektor-c ers

Table of Contents