Inspection & Preparation - Pro-Aqua PRO-S-80E Owner's Manual

Table of Contents

Advertisement

INSPECTION & PREPARATION
IMPORTANT!
!
Before installing - Please read the entire manual and become familiar with instructions and parts needed
before proceeding with the installation.
System Inspection
Please take the system and all the components out of the box. Inspect the system and all the connection fittings
carefully, make sure nothing is damaged during shipping. If any part is cracked or broken, please do not proceed
with the installation and contact Pro+Aqua or your distributor for an exchange or diagnosis.
System Components Breakdown (See Dia. A)
Aquatrol Valve Electronic Meter
5' of 3/8" Brine Line
Brine Tank
Bypass Valve
Drain Line Fitting
14' of 1/2" Drain Line
Top Distributor
Resin Media
Resin Tank
Riser Tube & Bottom Distributor
Control Valve
Upper Distributor Basket
Power Transformer
Extra Course Grade or Crystal water softener salt is needed to fill the brine tank
Required Components not Included with the System
Required Tool List for System Installation
Channel Locks
Screwdriver
Teflon Tape
Razor Knife
Two Adjustable Wrenches
Plastic inlet and outlet fittings are included with
the softener. To maintain full valve flow, 1" pipe to
and from the softener fittings are recommended.
Use copper, brass, or PEX pipe and fittings.
Some codes may also allow PVC plastic pipe.
Additional tools may be required if modification
to home plumbing is required.
- 2 -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents