Download Print this page

LG ESS HB 10.0 Installation Manual page 57

Residential battery unit

Advertisement

Available languages

Available languages

3.1.9 Installing the battery pack
CAUTION
Make sure that the inverter AC and DC disconnects are turned off before connecting the power
cable to the battery pack.
A Fix the lift handles to the hex-socket screws on
the rear (marked position) of both left and right
sides.
B Mount the wall bracket to a wall.
Tighten the screws, ensuring that they are
horizontally driven into the wall. (Must be
installed with recommended clearances
(720mm [29"]) on the edge of the wall bracket
as shown in the figure)
7 2 0
m m
( 2 9
" )
C Mount the battery pack to a wall bracket' s "U"
shape clip using the support by lift handles.
Remove the lift handles.
Installation
21
3

Advertisement

Chapters

loading

This manual is also suitable for:

Blgresu10h