Cable connections in the embedded AC/DC power supply scenario
NOTE
A 2 U device(NE08E-S6) is capable of housing an AC/DC power module.
Cable Installation Process
1. Install ground cable for the IMB network cabinet. Then install ground cable for the NE equipment.
2. Install power cables for NE equipment.
3. Install E1 cables.
4. Install Shielded network cables.
5. Install fibers.
chassis
2U-height
:
Ground cable for the NE
Ground cable for the IMB
External power cables
network cabinet
equipment
E1 cables
Shielded network cables
Fibers