Step 4 Top Frame Assembly
What you will need
STEP 1: Position the Bakelite Pillars with a spacing of 46.5mm between rear frame
piece and back of the pillar as shown in the Completed View on the next page.
Tip: When installing T-Nuts it helps to twist them onto the bolts a few turns keeping
them in place before placing into the Aluminum slot.
14
Bakelite Resin Plate C
10
(6) Bolt M5 x 16
32
(6) T-Nut 20M5
35
(6) T-Nut 20M5
35
10
Bakelite Resin
Plate C
(6) Bolt
32
M5 x 16
Need help?
Do you have a question about the 3018-PRO and is the answer not in the manual?
Questions and answers
I HAVE ONE 3018 PRO VER MY SPINDLE RUN SLOW AND HAVE A OUND AND ONE BLUE LIGHT ON TO YOU KNOW WHY