Commissioning

Connecting the device

• Only use the hose sets and cables included!
• Please note the procedures on pages 11 and 12 before connecting.
• Connect the foot switch (18) to the connection socket.
• Mount the plastic hose with circular connector (21/28) to the cartridge closure head (23) and connect
the quick coupling (28) to the cartridge connection (6).
• Connect the empty cartridge (24) to the cartridge closure head (23) and plug in the selected dosing
nozzle (27).
1
3
5
6

Device default settings

• Set the vacuum regulator (3) to 0 (turn clockwise!)
• Set the pressure regulator (2) to 0 (turn counterclockwise!)
• Use arrow keys (9+10) to set the dosing time to 0.01 second
1.
Netzschalter O n/O ff
2.
Druckregler
3.
Vakuumregler
• Switch on the power switch (1)
4.
LE D
5.
Display
6.
Kartuschenanschluss
7.
Menutaste
8.
E ntertaste
9.
Pfeiltaste auf
10.
Pfeiltaste ab
11.
Netzanschluss
12.
Schnittstelle ext. Steuerung
13.
Initiatoranschluss
14.
Druckluftanschluss
15.
Leistungsschild
4
7
9
2
8
10
9
Frontseite


Advertisement

Table of Contents
loading

This manual is also suitable for:

Kdg 1000-1Kdg 1000-6

Table of Contents