Eastwood HIGH-CAPACITY TUBING BENDER Instructions Manual page 4

High-capacity tubing bender
Table of Contents

Advertisement

assEMbLy
pinCH & sHarp MEtaL HaZard!
The Eastwood High-Capacity Tubing Bender consists of moderately heavy metal components which can present a hand/finger pinch hazard
and cause potentially serious injuries if dropped on feet. Avoid pinching hands while handling parts during assembly and wear thick, well fitting
work gloves to prevent cuts from handling sharp metal. The use of safety shoes is strongly recommended.
FraME assEMbLy
1. Lay the Lower Frame Plate (a) on a clean, level work surface.
notE: The Lower Frame Plate has two M8 tapped holes which must be
placed downward toward the work surface (Fig 1).
2. Using a 4" block of wood or other suitable material, place it between the
Lower Frame Plate (a) and the Upper Frame Plate (b) for temporary support.
3. Find the two 18mm bolt/washer/Frame Spacer/nut assemblies and disas-
semble them. Place the two Ø 1" x 4" [Ø 26mm x 102mm] Frame Spacers (C)
between the Lower Frame Plate and the Upper Frame Plate (Fig 2).
4. Place an M18 x 120mm Bolt (d) with 18mm washer (E) through the 19mm
hole in the Upper Frame Plate, Frame Spacer and Lower Frame Plate. Place
an 18mm washer (E) over the bolt and thread on the M18 locknut (F) leaving
it only finger tight at this time. Repeat with 2nd 18mm bolt and Frame Spacer
leaving it only finger tight as well (Fig 2).
driVE LinK sub-assEMbLy
1. Set one the two Drive Links (g) along their edges on a clean, level
work surface.
2. Find the two 12mm bolt/washer/Drive Link Spacer/nut assemblies and
disassemble them. Place the two Ø 3/4" x 2-13/16" [Ø 19mm x 72mm]
long Drive Link Spacers (H) between the two Drive Links (g) (Fig 2).
3. Add a 12mm washer ( i ) to an M12 x 120mm Bolt (J) then slip it through the
13mm hole in the upper Drive Link, through Drive Link Spacer (H) and lower
Drive Link (g). Place a 12mm washer ( i ) over the bolt and thread on the M12
nut (K) leaving it only finger tight at this time. Repeat with 2nd M12 Bolt (J)
and Drive Link Spacer (H) leaving it only finger tight as well.
4. Check for alignment: Temporarily Insert the two Ø 7/8" [Ø 22mm] polished
Drive Pins (L) & (M) through two of the four 22.5 diameter holes in both
Drive Links (g) to align them. Tighten both M12 Bolts (J) & M12 Locknuts (K)
then remove the Drive Pins.
5. Insert two Brass Flanged Bushings (n) with the smaller diameter offsets in
the large 32mm diameter holes and with the flanges located on the outer
sides of the Drive Links (Fig 3).
6. Set this Sub-assembly aside for installation to Frame.
4
FIG. 1
FIG. 2
L
b
a
FIG. 3
u
u
K
K
Eastwood Technical Assistance: 800.544.5118 >> techelp@eastwood.com
a
d
C
n
g
n
g

Advertisement

Table of Contents
loading

This manual is also suitable for:

21115

Table of Contents