Download Print this page

Kohler ENGLEFIELD CORNER CONTOUR PLUS Installation Instructions Manual page 8

Duracryl wall

Advertisement

DURACRYL WALL
DURACRYL WALL INSTALLATION CONT...
APPLYING THE ADHESIVE
Prepare sealant and adhesive cartridges.
Cut nozzle on sealant and adhesive cartridges
as shown in
figure 14
Pierce protective foil inside adhesive cartridge.
Fig.14: Cutting cartridges
ADHESIVE
SILICONE
Do not apply adhesive below
5°C. Temperatures below
this point will require the
!
adhesive to be warmed up
to assist with adhesive flow
CAUTION
and application.
Use only in ventilated areas.
Ensure the protective film
has been peeled back from
!
tiling bead of tray or bath
before applying sealant.
Leave the rest of the tray or
IMPORTANT
bath covered by the film to
protect it during installation.
below.
INSTALLATION INSTRUCTIONS
Apply sealant to shower tray or bath first as
shown in
figure 15
Apply a bead of sealant for 50 mm from both
front corners at base of upstand as shown.
Apply a second full length bead at top of upstand.
Fig.15: Apply beading to upstand
Apply adhesive to wall board.
Do not use on previously painted, sealed,
ceramic or plastered walls.
Use only on the following substrates:
• Villaboard
• Fibre cement
• Plaster Board
Follow the pattern marked. Start at top working
your way down. Apply vertical pattern first then
fill in horizontal lines.
For shower walls with moulded features
remember to apply the adhesive on the acrylic
wall as shown on previous page
Page 8
below.
(figures 12&13).
ENGLEFIELD

Advertisement

loading

This manual is also suitable for:

Corner contourSide recessed wallFlat wallBath wall