PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Mounting a module
Mount the A/D converter module in any desired configuration.
Page 30 System configuration
2.
Wiring
Perform wiring of external devices to the A/D converter module.
Page 27 External Wiring
3.
Adding a module
Add the A/D converter module to a module configuration by using the engineering tool. For details, refer to the following.
 GX Works3 Operating Manual
4.
Parameter settings
Set up the parameters of the A/D converter module by using the engineering tool. For details, refer to the following.
 MELSEC iQ-R Analog-Digital Converter Module User's Manual (Application)
5.
Offset/gain setting
Perform the offset/gain setting to set a user range, if necessary.
Page 38 OFFSET/GAIN SETTING
6.
Programming
Create a program. For details, refer to the following.
Page 30 OPERATION EXAMPLES
4 PROCEDURES BEFORE OPERATION
4
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec iq-r60ad4Melsec iq-r60adv8Melsec iq-r60adi8

Table of Contents