Rack Installation - Waring WCO250XE Manual

Quarter-size heavy-duty convection oven , 25-liter capacity
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

RACK INSTALLATION

Inserting wire racks and drip tray in the oven
The wire rack and drip pan are provided with a locking
mechanism to prevent their unintentional removal.
1. Insert the wire rack at a
slight angle (Fig. 1). The
rack should be installed
with the concave side
down.
2. Slide the wire rack
slightly forward until the
edge is past POINT A
(Fig. 2).
3. Once past POINT A,
lower the wire rack to
the horizontal position.
The rack can be slide
into position (Fig. 3
and 4).
16
Fig. 1
Fig. 2
Fig. 3
Fig. 4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wco250xk

Table of Contents