Commissioning; Before Commissioning - Wetrok Discomatic Mambo Operating Instructions Manual

Hide thumbs Also See for Discomatic Mambo:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 32
5

COMMISSIONING

5.1

Before commissioning

Before commissioning / Initial commissioning
Delivery, or instructions on safety regulations, handling and maintenance, in addition to initial commissioning,
are normally undertaken by an approved expert. If this is not the case, the user is responsible for instructing the operator.
Items of jewellery, such as rings and chains, must be removed.
Before operation:
1
Battery empty
3
Battery fully charged
Commissioning
without dosing system
1a
Fill with water
More about 4.
2
Load battery
2a
Add the desired quantity of
chemicals to the fresh water tank.
33
EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents