Installation Procedure (Ir-Adv C9075 Pro/C9070 Pro/C9065 Pro/ C9060 Pro Series, Ir-Adv C7065/C7055 Series); Removing The Super G3 2Nd Line Fax Board - Canon Super G3 3rd Line FAX Board-AE1 Service Manual

Table of Contents

Advertisement

23) Put applicable Modular Label [1] on the position shown in the figure.
24) Insert one side ends of 4 PTT Plugs or 4 Telephone Codes [1] into Modular Jacks on the
wall, remove the Dust Cover and then connect another ends to modular jacks for the lines
on the host machine.
25) Affix the FAX Approval Label [2] on the position shown in the figure.
NOTE:
This step is only for Taiwan.
[2]
26) Connect the power plug of the host machine to the power outlet.
27) Open the switch cover and turn ON the main power switch.
6
Installation > Installation Procedure > Installation Procedure (iR-ADV C9075 PRO/C9070 PRO/C9065 PRO/C9060 PRO Series, iR-ADV C7065/C7055 Series) > Removing
Installation
[1]
F-6-22
[1]
F-6-23
6
Installation > Installation Procedure > Installation Procedure (iR-ADV C9075 PRO/C9070 PRO/C9065 PRO/C9060 PRO Series, iR-ADV C7065/C7055 Series) > Removing
Installation
Installation Procedure (iR-ADV C9075 PRO/C9070
PRO/C9065 PRO/C9060 PRO Series, iR-ADV C7065/
C7055 Series)
NOTE:
In the model without the reader unit, the step of disconnecting/connecting the leader
power able is unnecessary.

■ Removing the Super G3 2nd Line Fax Board

1) Remove the Reader Power Supply Cable [1] and the 2 Telephone Cords [2].
[1]
6-10
[2]
F-6-24
6-10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Super g3 4th line fax board-ae1

Table of Contents