Disengage the existing mechanical sliding gate lock.
Hint: The sliding gate does not need an additional lock as the sliding gate
opener is self-locking when connecting to the sliding gate opener and power
mains. The gate cannot be easily opened without damaging the gate opener
or the hinges of the gate system.
5.
Built a concrete pad of approx. 50 x 32 x 35 cm (see drawing on page 7).
The concrete pad should be at least 10 cm over the ground. Increase the pad
height if necessary to protect the gate opener from flooding, heavy snow fall
etc. Make sure the concrete pad is level. Protect the sliding gate opener from
accidental impacts.
6.
Prepare one or more channels for the cables before pouring the concrete.
Remember that the cable channels have to pass through the hole in the base
plate (5). Allow the concrete pad to harden sufficiently before mounting the
sliding gate opener on the pad.
Preparation
- Hacksaw
- Ball Pen/Pencil