Installing The Bagger; Bagger; Clevis Pin; Hairpin Cotter - Toro 200 Z Master Series Operator's Manual

Bagger
Table of Contents

Advertisement

Note: The bolt head on the drive pulley assembly, should
be approximately a 1/4 in. (6mm) rearward of the center in
the frame slot (Fig. 11). View this from the right–hand side
of the machine.
2. Tighten the 4 bolts (1/2 x 1–1/4 in.), 4 washers (1/2 in.)
and 4 locknuts (1/2 in.) (Fig. 10).
Important
A final adjustment may be needed when
installing the bagger belt.
3
1
4
6
Figure 11
1. Drive pulley assembly
2. Bolt head—air cooled
machine only
3. PTO drive belt

Installing the Bagger

1. Install the bagger onto the bagger mounting bracket
(Fig. 12).
2. Install clevis pins into the bagger and bagger bracket.
Secure with hairpin cotters (Fig. 12).
5
2
m–5861
4. Bolt head—liquid cooled
machine only
5. Frame slot
6. 1/4 in.—liquid cooled
10
1
2
4
Figure 12

1. Bagger

2. Bagger mounting bracket
Installing Bagger onto a Liquid Cooled
Machine
Note: The following instructions are for liquid cooled
machines only.
1. Loosen bolts that hold the engine shroud.
2. Move the engine shroud forward as far as possible.
3. Tighten bolts that hold the engine shroud.
4. Remove the cable guide and bolt from the frame of the
bagger (Fig. 13).
5. Install the cable guide, bolt, and nut with the cable
behind the cable guide (Fig. 13).
Note: Make sure the cable guide can rotate.
6. Locate template number 1 in the back of this manual.
Cut out template number 1 as indicated on the template
(Fig. 13).
7. Position the template on the right–hand side of the
engine shroud (Fig. 13).
8. Line up the mark on the template where the cable bolt
hits the engine shroud and the template bottom is flush
with the bottom of shroud (Fig. 13).
3
m–6002

3. Hairpin cotter

4. Clevis pin

Advertisement

Table of Contents
loading

This manual is also suitable for:

78491

Table of Contents