Description
Caster weight
U–bolt
Nut, 1/2 in.
Lock washer, 1/2 in.
Plate
Top weight
Bolt, 1/2 x 3 in.— for two top weights
Bolt, 1/2 x 4 in.— for three top weights
Removing the Drive Wheels
Danger
Mechanical or hydraulic jacks may fail to support
machine and cause a serious injury.
Use jack stands when supporting machine.
Do not use hydraulic jacks.
1. Loosen the drive wheel lugs or nuts.
2. Raise the rear of the machine and support with jack
stands.
3. Remove the drive wheels.
Installing the Bagger Mounting
Bracket and the Side Brackets
If you have a liquid cooled machine, go to page 6 for
Installing the Bagger Mounting Bracket onto a Liquid
Cooled Machine.
If you have an air cooled machine, use instructions below
for Installing the Bagger Mounting Bracket onto a Air
Cooled Machine.
Qty.
Use
2
2
Installing the caster weights
4
4
2
6
2
Installing the top weights
2
Installing the Bagger Mounting
Bracket onto an Air Cooled
Machine
Important
Do not tighten any bolts until both side
brackets and bagger mounting bracket are fit loose on the
machine.
Refer to Tightening the Mounting Bolts, on page 8, for the
correct procedure to tighten the bolts.
Installing the Bagger Mounting Bracket to
the Side Brackets (Air Cooled)
Important
When installing the bagger bracket for an
air cooled machine, use only 2 long frame spacers; 1 per
each side (Fig. 2).
1. Install the side brackets to the bagger mounting bracket
(Fig. 2).
2. In the top two holes, install 2 bolts (3/8 x 1–1/2 in.),
2 flange nuts (3/8 in.) one long frame spacer, and one
short frame spacer (Fig. 2).
Note: Make sure the long frame spacers are installed as
shown in figure 2.
3. In the bottom hole, install a bolt (3/8 x 1–1/4 in.) and a
flange nut (3/8 in.) (Fig. 2).
4. Install a bracket stiffener to the side bracket and bagger
mounting bracket. Use 4 bolts (3/8 x 3/4 in.) and 4
flange nuts (3/8 in.) (Fig. 2).
5