4.0 finishing
finishing
EN
WARNING
!
•
Power supply service must be completed prior to finishing to avoid reconstruction.
•
Heat vents and air openings cannot be covered in any circumstances.
4.1
NEFI24H log placement
1
Place the logs shown on the location
dimples on the burner platform.
3
Place log (#2) onto the pin. Ensure
the log is secure onto the pin, as
4.2
NEFI27H log placement
1
Place the logs shown on the location
dimples on the burner platform.
14
W415-1461 / G / 07.20.20
#2
NEFI24H
shown.
NEFI24H
2
#1
Place the log (#1) onto the pin.
Ensure the log is secure onto the
pin, as shown.
NEFI24H
2
PIN
NEFI27H
Place log (#1) onto the pin. Ensure the log
is secure onto the pin, as shown.
PIN
PIN
#1