DM Industries Portable Spa Owner's Manual page 9

Dm industries, ltd. owners manual portable spa
Table of Contents

Advertisement

7. INSTALL THE BOTTOM BELT
with the top one.
IMPORTANT:
INTERLOCKING
DESIGNED TO SUPPORT THE WEIGHT OF THE
WATER OVER EXTENDED PERIODS OF TIME.
THE BANDS MUST BE INSTALLED TO PROVIDE
THE STRUCTURAL AND LOAD SUPPORT TO THE
SPA WALLS. FAILURE TO INSTALL THE BELTS
COULD CAUSE TEARING AT THE WALL HINGES
AND WILL VOID THE WARRANTY.
8.
PLACE THE THERAPY MODULE
spindles and the seat with the punched hole. When placing the
module, make sure the inside lower edges of the module are kept
away from the liner to prevent tearing it.
INTAKE
TUBE
PUNCHED
HOLE
9.
FILL UP SPA
"Initial Start Up Procedures. "
DO NOT PLUG IN THE THERAPY MODULE
UNTIL THE SPA HAS BEEN FILLED AND
PRIMED PROPERLY.
aligning the belt spindle
THE
SPA
WALLS
PINS
HAVE
NOT
over the wall, the belt
and follow the instructions listed in
SEAM
AND
BEEN
9
PAGE 7
7
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents