GREEN BAG
4
STEP
• Place the bottom of the left oval upright
(4a) onto the protruding bolts of 1d.
NOTE: Make sure the 27 holes of 4a are
on the outside. Mate the hole in the top of
4a with the top hole of 3a. Attach and
tighten one flat (10x30x2T) & spring
(SW10.2x18.4x2.5T) washer and one
bolt (M10x1.5Px60L). Tighten with a 6mm
L-shaped wrench. Place one flat (10.5x18x2T)
& one spring (SW10.2x18.4x2.5T) washer,
and one nut (M10x1.5P) on both bolts
protruding from 1d. Tighten with a 17mm
wrench. Repeat the process with the right
oval upright (4b).
3a
4a
4b
1d
1c 1c
12