4.2 Installation Site Required
Power Pack installation site environment has very important influence to
the safe operation, the performance and life of the Power Pack. Choose
the right installation site before install the Power Pack.
All installation must comply with local standards.
●
Do not install the Power Pack at a flammable or explosive place or a place
●
where the flammable or explosive materials are stored.
Do not install the Power Pack in a place where there is a risk of explosion.
●
Do not install the Power Pack in places where the Power Pack is
●
vulnerable to lightning strike.
Do not install the Power Pack in a higher salt spray environment.
●
Power Pack installation site must be in good ventilation, do not install the
●
Power Pack in the closed case.
Power Pack protection level is IP65, can be installed outdoor, when
●
the Power Pack is installed outdoor, should be installed as far as
possible in the eaves or other have the shadow place, avoiding
direct sunlight, rain and snow
Power Pack is installed indoor; keep away from windows, avoiding
●
lightning.
The installation place selected should be solid enough to support the
●
Power Pack weight for a long period.
The site for Power Pack installation must be clean and the ambient
●
temperature must be maintained within -25 to +60 °C.
Power Pack installation site relative humidity should not be more
●
than 95%, water vapor may corrode Power Pack, and damage the
internal components.
The Power Pack must be installed in a place convenient for
●
observation and maintenance.
4.3 Installation Direction
The Power Pack should be installed vertically or titled backwards with a
●
internal
3.5mm
hexagonal
wrench
.
10
Used for cable connecting of AC
input side