Download Print this page

Cisco ASR-920-12SZ-IM Quick Start Manual page 17

Aggregation services router
Hide thumbs Also See for ASR-920-12SZ-IM:

Advertisement

Figure 13: Installing the DC Power Supply Module
Activate a DC Power Supply Module
Perform the following procedure to activate a DC power supply:
Procedure
Step 1
Remove the tape from the circuit-breaker router handle, and restore power by moving the circuit-breaker router handle
to the On (|) position.
Step 2
Verify power supply operation by checking if the respective power supply front panel LED (PS0 or PS1) is green.
Step 3
If the LEDs indicate a power problem, see Troubleshooting.
Step 4
If you are connecting a redundant DC power supply, repeat these steps for the second power source.
If you are connecting a redundant DC power supply, ensure that each power supply is connected to a separate
Note
power source in order to prevent power loss in the event of a power failure.
17

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Asr-920-u-12sz-im