Perform the following procedure to ground the router using a 2-hole lug and the corresponding mounting point. Most carriers require
a minimum 6-AWG ground connection. Verify your carrier's requirements for the ground connection.
Procedure
Step 1
If your ground wire is insulated, use a wire-stripping tool to strip the ground wire to 0.5 inch ± 0.02 inch (12.7 mm ±0.5
mm).
Figure 10: Stripping a Ground Wire
Step 2
Slide the open end of your 2-hole ground lug over the exposed area of the ground wire.
Step 3
Using a crimping tool (as specified by the ground lug manufacturer), crimp the ground lug to the ground wire as shown
in the following figure.
Figure 11: Crimping a Ground Lug on to the Ground Wire
Step 4
Use a Phillips head screwdriver to attach the 2-hole ground lug and wire assembly to the router with the 2 pan-head
Phillips head screws.
Step 5
Connect the other end of the ground wire to a suitable grounding point at your site.
Installing the Fan Tray
Follow these steps to install the fan tray in the chassis:
Caution
Electric Shock Hazard: This fan tray has to be serviced by trained personnel only.