Majestic fireplaces DVRTSB Installation And Operating Manual page 26

Bay window rear/top convertible direct vent fireplaces
Table of Contents

Advertisement

DVRTSB Bay Window Fireplace
WARNING: Before doing any gas control service work, remove glass front.
START
Gas Supply On
YES
Pilot Lights With Piezo
Ignitor
YES
Pilot Stays Lit
YES
Pilot Lights Main Burner
YES
System OK
26
Troubleshooting the Gas Control System
Honeywell Millivolt Valve
NO
NO
NO
NO
CHECK
Supply Line Hooked Up
Shutoff Valve Open
Lockout Has Engaged. Wait 60
Seconds And Try Again.
For Spark At Electrode While
Depressing Piezo
1/8" Gap To Pilot Hood Needed.
All Wiring Connections
Replace Piezo Ignitor
For Air In The Lines
Thermopile Needs A Min.
325mv. Adjust Pilot Flame
Height.
All Wiring Connections
Replace Thermopile
Thermocouple Needs A Min. Of
14mv
Valve Is Turned On
Wall Switch Is Not Turned On.
Watch For Grounded Wires!
Thermopile Needs A Min. 325mv.
Plugged Burner Orifice
Defective Valve. Turn To Pilot,
Meter Should Read Greater Than
100mv. If Not, Replace.
10003848

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents