Figure 2-8: Connections For Air Bearing And Counterbalance - Aerotech ABL1500Z Hardware Manual

Table of Contents

Advertisement

ABL1500Z Hardware Manual
Initial pneumatic counterbalance setup:
1. Before you remove the shipping bracket, connect the air lines to the air bearing and pneumatic
counterbalance stage fittings
N O T E : Refer to
Section 1.4.
before you continue.
Figure 2-8:
2. Turn on the air supply to both the air bearing stage and the pneumatic counterbalance. The pressure
supply to the counterbalance fitting must exceed the pressure determined by
3. Loosen, but do not remove, the two M5-0.8x25mm socket head cap screws mounting the shipping
bracket to the end of the carriage
mm).
www.aerotech.com
Mechanical Specifications and Installation
(Figure
2-8).
for air requirements. Make sure that the air supply meets specifications
Connections for Air Bearing and Counterbalance
(Figure
2-9). Loosen the screws by two to three turns (1.6 mm to 2.4
Chapter 2
Figure
2-7.
25

Advertisement

Table of Contents
loading

Table of Contents