Precautions - IDEAL Viceroy GT Series Installation, Assembly And Servicing

Oil or dual gas fired boilers
Table of Contents

Advertisement

ASSEMBLY
Maintenance of the combustion chamber
- open the burner door (lower door) by unscrewing 4 lock
nuts (19mm spanner)
- brush the inside of the combustion chamber
- using a vacuum cleaner, vacuum up the soot deposits
accumulated in the combustion chamber
- close the door and replace the front cover
Cleaning the smoke box (flue hood)
For this purpose:
- remove the left and right hand sweeping covers of the
smoke box (2 H12 nuts + washers - 19mm spanner) and
remove the soot using a vacuum cleaner
- replace the sweeping covers
Precautions to be observed in case of very long stop of the boiler
- The boiler and the chimney must be carefully swept
- Shut the boiler doors to avoid any air flow inside
- If the boiler is going to be stopped for several months, we
also advise removing the flue connection off the nozzle and
to close it with a cover
20
For latest prices and delivery to your door visit MyTub Ltd - 0845 303 8383 - www.mytub.co.uk - info@mytub.co.uk
- In case of stop of the heating in winter leading to risks of
freezing, we advise the use of a concentrated antifreeze
agent to prevent the heating water from freezing.
Otherwise, completely drain the installation
Viceroy GT Range
Vacuum
Cleaner
- Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents