Oil Or Gas Connection - IDEAL Viceroy GT Series Installation, Assembly And Servicing

Oil or dual gas fired boilers
Table of Contents

Advertisement

6

OIL OR GAS CONNECTION

See specific technical information supplied with the burner.
Caution: The baffle at the head of the burner must be in line
with the burner door insulation level.
Drilling Ø for burner door (on request).
Baffle
Burner door
insulation
Gas Supply
The gas supply MUST be sized in accordance with British
Gas recommendations and be fabricated in compliance with
CP.331 Pt.3 any Local Gas Board installation standards.
The Local Gas Board should be contacted, at a stage prior to
actual installation, for any advice or information required.
Details and advice, relating to the use of L.P.G. for firing the
IDEAL VICEROY GT range of heating boilers, are available on
request to Caradon Ideal Ltd.
Viceroy GT Range
- Installation
For latest prices and delivery to your door visit MyTub Ltd - 0845 303 8383 - www.mytub.co.uk - info@mytub.co.uk
8229-EN-10
** maxi diameter for fixing:
Ø B maxi = 290 mm
or
Ø B maxi = 330 with 4 fixings at 15° or at 45°
Ø A
135
175
Ø B**
170
200
Ø M
8
8
Oil Storage Tank
The oil storage tank, oil supply pipe and connections to the
burner unit MUST comply with the requirements of BS.779
and CP.5410.
The installation should conform to the recognised standards
of good practice in the trade and comply with the relevant
Codes of Practice, Building Regulations and Local Authority,
Fire and insurance requirements.
INSTALLATION
190
240
250
290
220
270
325
330
10
10
14
12
8229-EN-09
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents