Figure 4.1-3 Battery Installation - PCC FTI PowerPak FT-B100 Series Operation, Maintenance, And Repair Manual

Table of Contents

Advertisement

4.1.8
Battery Installation
1. Ensure that remote pendant switch is in the OFF (O) position.
2. Lift battery door and hold it open.
3. Align ribs on battery and battery bracket. Then, slide the battery fully into the battery compartment
until it stops.
4. Ensure battery release button snaps in place and that the battery is fully seated and secured before
beginning operation.
5. Close the battery door.
2
To ensure compatibility and proper operation, use only Briggs & Stratton 82V lithium-ion batteries with the
pump. Refer to Table 3.1-1 for battery model number information.
4.1.9
Battery Removal
1. Ensure Pump motor is switched off.
2. Lift the battery door and hold it open.
3. Press the release button located above battery.
4. Slide the battery outwards and remove it from the battery compartment. Refer to Figure 4.1-3.
4.1.10 Battery Management System
The battery management system monitors and controls battery operation:
A low voltage cut-off feature will shut down the battery when the battery voltage drops to below the
acceptable limit.
A high temperature shut down feature will shut down the battery if its internal temperature rises to
above the acceptable limit.
If the low voltage cut-off or high temperature shut down feature is activated while the pump is
operating, the pump motor will emit a beeping sound and the pump will stop.
If the high temperature shut down feature is activated, the battery must cool down to an acceptable
internal temperature before the pump can be restored.
Fatigue Technology
401 Andover Park East
830959-REV A
Figure 4.1-3
Battery Installation
Seattle, WA • USA 98188-7605
1
3
4
Tel: (206)246-2010
Fax: (206)244-9886
12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fti powerpak ft-b100-120vFti powerpak ft-b100-220v

Table of Contents