Page 2
Fatigue Technology (FTI) is a world-leading aerospace engineering and manufacturing company. FTI pioneered cold expansion technology (which provides solutions to fatigue problems associated with holes in metal structures) back in 1969 and have advanced this science to develop innovative bushing and fastener products. These proprietary products and associated tooling may be covered by patents or agreements owned by, or exclusively licensed to Fatigue Technology.
TABLE OF CONTENTS SECTION DESCRIPTION PAGE Introduction ............................1 About the FT-B100 Series Cordless PowerPaks ..............1 General Specifications ......................1 Safety ..............................2 Safety Symbols and Definitions ..................... 2 General Hydraulic Safety Precautions ................... 3 Battery Operated Pump Safety Precautions ................4 Major Features and Components ......................
Page 4
TABLE OF CONTENTS (Continued) SECTION DESCRIPTION PAGE TABLES Table 3.0-1 Pump Features and Components ......................5 Table 3.1-1 Pump Specifications ..........................6 Table 3.2-1 Pump Specifications - Key Dimensions ....................7 Seattle, WA • USA 98188-7605 Fatigue Technology 401 Andover Park East Tel: (206)246-2010 Fax: (206)244-9886 830959-REV A...
1.0: I ECTION NTRODUCTION This instruction manual contains information on the operation and maintenance of the FT-B100 Series Cordless Hydraulic PowerPaks. To obtain optimum performance and many years of trouble-free service, operate the PowerPak properly and follow maintenance procedures carefully. The key to trouble-free operation is maintaining a clean air supply and clean hydraulic oil.
2.0: S ECTION AFETY Read all instructions carefully. Follow all recommended safety precautions to avoid personal injury as well as damage to the pump and/or damage to other property. Fatigue Technology cannot be responsible for any damage or injury from unsafe use, lack of maintenance or incorrect operation. Do not remove warning labels, tags, or decals. In the event any questions or concerns arise, contact Fatigue Technology for clarification.
GENERAL HYDRAULIC SAFETY PRECAUTIONs ⚠ WARNING Failure to observe and comply with the following precautions could result in death or serious personal injury. Property damages could also occur. Do not remove or disable the pressure relief valve. Never set the pressure relief value to a higher pressure than the maximum rated pressure of the pump. ...
BATTERY OPERATED PUMP SAFETY PRECAUTIONS ⚠ WARNING Failure to observe and comply with the following precautions could result in death or serious personal injury. Property damage could also occur. Do not use the pump if the remote pendant rocker switch cannot turn the pump on or off. Have the remote pendant repaired before using the pump.
3.0: M ECTION AJOR EATURES AND OMPONENTS Table 3.0-1 Pump Features and Components Replacement Part Number Key: 1199-499 1. Remote Pendant 2. Carrying Handle/Roll bar 3. Hydraulic Reservoir Sight Glass 4. Hydraulic Reservoir Drain Plug 1125-024 (shipping and operation plugs as one part number) 5.
PRODUCT DATA Table 3.1-1 Pump Specifications Pump Sound For Use With Operating Temp Range Motor Rating Model Pressure RailTec Puller 40 to 120 F FT-B100 1.4HP 1.0kW 75 dBA Unit +4 to +49C Pump Maximum Flow Rate Flow Rate Flow Rate Reservoir Pump Hydraulic...
PRIOR TO PUMP OPERATION Consult the appropriate puller unit manual for safety precautions before installing a puller unit onto a PowerPak. When used in accordance with these instructions, the FT-B100 PowerPak is safe and easy to use. All general safety precautions associated with hydraulic operated power tools should be observed. Many of these are noted in this section.
10. Use caution when operating the PowerPak near electric power sources. The PowerPak is not generally insulated for coming into contact with electric power sources. 11. Do not use in potentially explosive atmospheres. 12. Two ISO safety labels have been placed on machinery to alert the operator of certain precautions that must be met to ensure proper and safe operation of the machinery.
4.0: O ECTION PERATING NSTRUCTIONS INTRODUCTION, HYDRAULIC POWERPAK SETUP PROCEDURE AND OPERATION The FTI-B100 combines the high performance of an electric AC-powered pump with the convenience of a cordless, battery powered pump. It is ideal solution for remote locations, where electrical or pneumatic power sources are not available.
4.1.4 Important Receiving Instructions Visually inspect all components for shipping damage. Shipping damage is not covered by warranty. If shipping damage is found, notify carrier at once. The carrier is responsible for all repair and replacement cost resulting from damage in shipment. Note: Personnel should read this and associated puller unit manuals prior to use.
4.1.8 Battery Installation 1. Ensure that remote pendant switch is in the OFF (O) position. 2. Lift battery door and hold it open. 3. Align ribs on battery and battery bracket. Then, slide the battery fully into the battery compartment until it stops.
4.1.11 Additional Battery and Charger Information The battery is not shipped fully charged. It is recommended that battery be fully charged before first use to ensure maximum run time can be achieved. For best result, the battery should be charged in a location with a temperature between 43˚ F [61˚ C] and 104˚...
Page 18
4.2.4 Operating Precautions ⚠ WARNING Failure to observe the following precautions and instructions could allow load to drop on persons working in the area. Death or serious personal injury could result. Keep persons away from area under load during lifting, lowering and whenever the control value lever is moved.
5.0: M ECTION AINTENANCE 5.0.1 Check Oil Level Be sure hydraulic cylinder or other tool is fully retracted. Remove the battery from the pump. Place the pump on a level surface. Visually check the oil level by looking through the hydraulic reservoir sight glass. Reservoir is FULL when oil level is about halfway between the top and bottom of the sight glass.
Figure 5.0-1 Hydraulic Reservoir TRANSPORTATION AND SHIPMENT 1. A PowerPak will leak if tipped or inverted. Therefore, it is essential to DRAIN ALL HYDRAULIC FLUID prior to shipment. This is especially important because many federal and international regulations restrict shipment of containers that may leak fluids. Seattle, WA •...
6.0: T ECTION ROUBLESHOOTING This section provides some basic steps to identify possible causes of trouble, together with troubleshooting solutions. If you cannot solve your maintenance or operation problem with the information provided in this section, contact the nearest FTI representative. Failure to observe and comply with the following precautions could result in death or serious personal injury.
TROUBLESHOOTING GUIDE (continued) Symptom Possible Cause Solution A. Pump element piston is sticking. Noisy and/or vibrating Contact Fatigue Technology. pump operation. B. Motor is damaged. A. Oil level low. Add oil until reservoir is full. To prime the pump. Be sure that the pump reservoir is filled with oil.
Figure 6.0-2 Overall System Hydraulic Circuit Diagram Seattle, WA • USA 98188-7605 Fatigue Technology 401 Andover Park East Tel: (206)246-2010 Fax: (206)244-9886 830959-REV A...
7.0: M ECTION ATERIAL AFETY HEETS Seattle, WA • USA 98188-7605 Fatigue Technology 401 Andover Park East Tel: (206)246-2010 Fax: (206)244-9886 830959-REV A...
Page 28
Seattle, WA • USA 98188-7605 Fatigue Technology 401 Andover Park East Tel: (206)246-2010 Fax: (206)244-9886 830959-REV A...
Page 29
Seattle, WA • USA 98188-7605 Fatigue Technology 401 Andover Park East Tel: (206)246-2010 Fax: (206)244-9886 830959-REV A...
Page 30
Seattle, WA • USA 98188-7605 Fatigue Technology 401 Andover Park East Tel: (206)246-2010 Fax: (206)244-9886 830959-REV A...
Page 31
Seattle, WA • USA 98188-7605 Fatigue Technology 401 Andover Park East Tel: (206)246-2010 Fax: (206)244-9886 830959-REV A...
Page 32
Seattle, WA • USA 98188-7605 Fatigue Technology 401 Andover Park East Tel: (206)246-2010 Fax: (206)244-9886 830959-REV A...
FATIGUE TECHNOLOGY 401 Andover Park East Seattle, Washington 98188-7605 E.C. DECLARATION OF CONFORMITY Manufacturer: Fatigue Technology 401 Andover Park East Seattle, WA 98188-7605 Telephone: (206) 246-2010 Fax: (206) 244-9886 Responsible Person in E.C.: Jean-Michel Derisson 4 rue d’Austerlitz 31490 Léguevin FRANCE Telephone: 33 5-34-559-916 Fax:...