USSC Clayton 1600M Installation & Operator's Manual page 8

Wood and coal furnace
Table of Contents

Advertisement

DISTRIBUTION BLOWER INSTALLATION
Distribution blower slides onto rear of furnace.
Engage blower flange with channels and press down.
SHAKER GRATE HANDLE INSTALLATION
1. Attach angle with two 1/4" x 3/4" hex bolts and two 1/4"
lock nuts.
2. Attach handle with 1/4" x 1" hex bolt and 1/4" lock nut.
3. Put brass knob onto end of handle.
1
2
3
SMOKE DOOR INSTALLATION
1/4" X 1-1/4"
CARRIAGE BOLTS
FRONT
OF
FURNACE
FUEL
LOADING
DOOR
FRAME
INSTALLING ASH DOOR SPIN DRAFT
1. Screw spin draft onto 3/8" x 2-1/2" carriage bolt.
2. Screw spin draft and bolt assembly into ash door
allowing approximately 1/2" of the bolt to extend
beyond the inside of the door.
3. Secure bolt in place with 3/8-16" locking nut.
3/8-16 x 2-1/2"
CARRIAGE
BOLT
3/8-16" LOCK NUT
8
SMOKE DOOR CLIPS
SMOKE DOOR
SPIN DRAFT CAP
1/4" LOCK
NUTS

Advertisement

Table of Contents
loading

Table of Contents