Installation Of Optional Equipment - USSC Clayton 1600M Installation & Operator's Manual

Wood and coal furnace
Table of Contents

Advertisement

INSTALLATION OF OPTIONAL EQUIPMENT

1. Remove access panel at rear of enclosure.
2. With a utility knife cut out the section of fiberglass insulation
directly behind the access panel.
3. Remove cover plate from rear of firebox.
4. Place one nut on each end of the coil and thread each as
far as they will go.
5. Place the coil through the holes from the inside of the firebox
and run a washer and nut down each leg on the outside of the
stove. Before tightening the nuts down completely, wrap a
piece of hi-temp fiberglass rope gasket, provided with the kit,
around each threaded leg between the washer and the outside
of the firebox. Tighten the nuts down securely to insure an
airtight installation. The installation is now ready to be plumbed
to your existing domestic hot water system. Choose one of the
three methods described in the Hot Water Kit Installation
Instructions.
6. Remove knockouts from access panel and attach to furnace
enclosure.
7. Have a qualified plumber connect your domestic hot water
pipe to the coil with appropriate fittings.
INSTALLING DOMESTIC HOT WATER COIL
5
1. NUT
2. WASHER
3. GASKET
ACCESS
1
PANEL
4
REAR WALL OF FIREBOX
DOMESTIC HOT
WATER COIL
TURN INSIDE NUTS UP
TO END OF THREADS
18
2
3
6

Advertisement

Table of Contents
loading

Table of Contents