USSC Clayton 1600 Installation & Operator's Manual page 10

United state stove co. the wood and coal furnace installation/operator's manual 1600, 1800
Table of Contents

Advertisement

MOUNTING PROCEDURE FOR DRAFTS
DRAFT
TUBE
CLAMP
FORCED AIR DRAFT
(SHIPPED WITH UNIT)
1. Using (2) 1/4" x 1" bolt, lock washer and nut, attach draft
adapter bracket to furnace draft tube.
MOTORIZED NATURAL DRAFT
MOTORIZED NATURAL DRAFT
Models 1600 / 1800
1. Using (2) 1/4" x 1" bolts, lock washers and nuts,
attach draft to furnace with draft tube clamp.
2. Plug draft power cord into receptacle on front of furnace.
MODEL 1600/1800 -
KIT #C60357M
MODEL 1600/1800
8
OPTIONAL
KIT #69189

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Clayton 1800

Table of Contents