Mechanical Installation; Preparing For Mechanical Installion - Datalogic DM3610 Reference Manual

Two-head dimensioning system
Table of Contents

Advertisement

MECHANICAL INSTALLATION

2 MECHANICAL INSTALLATION
WARNING: Electrical Installation by Qualified Service Technicians
Only! Procedures may involve exposure to high-voltage. A trained and
authorized technician must perform these procedures. Do not attempt to
perform any electrical installation procedures unless you are a trained
technician.
IMPORTANT: The DM3610 contains electronics that may be affected by
electrostatic discharge (ESD). To prevent personal injury or damage to the
unit, please follow the safety precautions and warnings found in the
References section at the beginning of this manual. Failure to follow these
precautions may void your warranty.

2.1 PREPARING FOR MECHANICAL INSTALLION

IMPORTANT: Application-specific drawings and documents provided by
Datalogic supersede any contradictory content in this manual.
Before mounting any components, please do the following:
 Read all instructions before beginning your installation.
 Define and confirm the accuracy of your application's requirements and structure position,
especially the height of the conveyor from the floor.
 Review all installation-specific drawings provided with your system.
 Review and plan the mechanical installation of all devices used in your application. Be
sure to allow adequate clearance for maintenance.
 Review and plan the power requirements for your application.
 Check the contents of the shipping cartons against the packing list(s).
 Record all product serial numbers.
NOTE: Refer to the Reference Documentation for details on
connecting your dimensioner(s) to other devices in the system.
For specific information on the DM3610 dimensioner, refer to the
DM3610 Reference Manual.
2
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents