Mount The Burner On The Boiler; Check Oil Line Seals - Bentone B45A 2.2H Installation And Maintenance Instruction

Table of Contents

Advertisement

4.6 Mount the burner on the boiler

1.
Separate the burner body and the flange.
2.
Remove the brake disc from the oil pipe.
3.
Install the selected nozzle. (See Technical data)
4.
Install the brake disc on the oil pipe
5.
Remove the burner pipe from the flange.
!
If the burner tube must be installed from the inside of the boiler,
this means that the boiler must be opened or have a spectacle
flange that is designed so that it can be reconnected with the
burner tube mounted.
6.
Install the flange with gasket on the boiler.
7.
Install the burner pipe on the flange. Make sure that the holes in the
front edge of the burner pipe are pointing down (not on all burner
pipes). This allows any drops of oil to run out.
8.
Insulate between the burner and boiler door to reduce radiated heat.
9.
Install the burner body on the flange.
10.
Lock the burner body using with the nut/nuts.
11.
Connect the oil pipes to the pump, refer to the chapter - servicing of
burners
12.
Connect the burner electrically, refer to the chapter - servicing of
burners

4.7 Check oil line seals

Once the burner has been installed and commissioned, the seals of the
various coupling elements should be checked (A).
When a leak is detected, it is usually sufficient to tighten the coupling
element that is leaking.
A A
A
A
A
A
165 105 61
17
Bentone

Advertisement

Table of Contents
loading

Table of Contents