Install The Top Cover - Lenovo ThinkSystem SR645 Setup Manual

Hide thumbs Also See for ThinkSystem SR645:
Table of Contents

Advertisement

Install the top cover

Use this information to install the top cover.
S033
CAUTION:
Hazardous energy present. Voltages with hazardous energy might cause heating when shorted with
metal, which might result in spattered metal, burns, or both.
S014
CAUTION:
Hazardous voltage, current, and energy levels might be present. Only a qualified service technician is
authorized to remove the covers where the label is attached.
Attention:
• Read "Installation guidelines" on page 92 to ensure that you work safely.
• Power off the server and disconnect all power cords for this task.
• Prevent exposure to static electricity, which might lead to system halt and loss of data, by keeping static-
sensitive components in their static-protective packages until installation, and handling these devices with
an electrostatic-discharge wrist strap or other grounding system.
Operating the server with the top cover removed might damage server components. For proper cooling and
airflow, install the top cover before you turn on the server.
A video for this task is available at:
• Youtube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-DY1RaWHYM4xDloAwuBQHR0
• Youku:
http://list.youku.com/albumlist/show/id_52339628
Procedure
Step 1.
Check your server and ensure that:
• All cables, adapters, and other components are installed and seated correctly and that you have
not left loose tools or parts inside the server.
• All internal cables are connected and routed correctly. See Chapter 3 "Internal cable routing" on
page 51.
.
Chapter 4
Server hardware setup
149

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents