TP48200A-HT19C4-1 & TBC300A-TCA2
Installation Guide
Figure 4-2 Removing the TBC300A-TCA2 from the pallet
(1) Pallet
----End
4.3 Marking Hole Positions
Prerequisites
Procedure
Step 1 Remove the top cover from the power cabinet packing box, and find the marking-off template
on the cover interior, as shown in
Issue 01 (2014-03-12)
Keep the installation environment clean and dry.
Ensure that the concrete floor where the cabinet is to be installed is flat.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
4-3.
4 Installing Cabinets
33