Download Print this page

Daintree GE current Tetra PowerStrip Snap DS Installation Manual page 4

Led lighting system

Advertisement

Tetra
PowerStrip Snap DS
®
Installation Using Tetra
Sign
1
Measure and cut Tetra® Snap Rail to appropriate
length to fit into sign. For retrofitting a sign, see
page 6.
More bright
Evenly space modules across the Tetra
3
Rail. Different brightness levels can be achieved
depending on module spacing.
Snap Rails
®
Rail (mounted vertically)
Less bright
Snap
®
4
2
Align peg on top of the light module with hole
on top of the Tetra
Snap Rail and push module
®
into rail until it snaps into place. For added
security, fasten module to rail with a screw.
Mount endcap
to sign structure
Secure the Tetra® Snap Rail to the inside of the
4
box sign using the standard Tetra® Snap Frame
Endcaps or other suitable means.
Installation Guide
SNAP!

Advertisement

loading

This manual is also suitable for:

Geds71-3Geds65-3Geds57-3Geds50-3Geds41-3Geds32-3