Download Print this page
HP EliteBook x360 830 G7 Product End-Of-Life Disassembly Instructions

HP EliteBook x360 830 G7 Product End-Of-Life Disassembly Instructions

Hide thumbs Also See for EliteBook x360 830 G7:

Advertisement

Quick Links

Product End-of-Life Disassembly Instructions
Product Category: Notebooks and Tablet PCs
Marketing Name / Model
[List multiple models if applicable.]
HP EliteBook x360 830 G7 Notebook PC
HP EliteBook x360 830 G7
Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for the
disassembly of HPI products to remove components and materials requiring selective treatment, as defined by EU directive
2012/19/EC, Waste Electrical and Electronic Equipment (WEEE).
NOTE: Recyclers should sort plastic materials into resin streams for recycling based on the ISO 11469 plastic marking code on the
plastic part. For any questions on plastic marking, please contact
1.0 Items Requiring Selective Treatment
1.1 Items listed below are classified as requiring selective treatment.
1.2 Enter the quantity of items contained within the product which require selective treatment in the right column, as applicable.
Item Description
Printed Circuit Boards (PCB) or Printed Circuit
Assemblies (PCA)
Batteries, excluding Li-Ion batteries.
Li-Ion batteries. Include all Li-Ion batteries if more than
one is provided with the product (such as a detachable
notebook keyboard battery, RTC coin cell, etc.)
Mercury-containing components
Liquid Crystal Displays (LCD) with a surface greater than
100 sq cm
Cathode Ray Tubes (CRT)
Capacitors / condensers (Containing PCB/PCT)
Electrolytic Capacitors / Condensers measuring greater
than 2.5 cm in diameter or height
External electrical cables and cords
Gas Discharge Lamps
Plastics containing Brominated Flame Retardants
EL-MF877-00
Template Revision C
Last revalidation date 09-May-2018
Notes
With a surface greater than 10 sq cm
All types including standard alkaline, coin or button style
batteries
Battery(ies) are attached to the product by (check all
that apply with an "x" inside the "[ ]"):
[x] screws
[x] snaps
[
[
NOTE: Add detailed removal procedures including
required tools in the sections 3.1 and 3.2.
For example, mercury in lamps, display backlights,
scanner lamps, switches, batteries
Includes background illuminated displays with gas
discharge lamps
DC Cable for External Power Supply
HPI instructions for this template are available at
HP's Sustainability
Contact.
] adhesive
] other. Explain
EL-MF877-01
Quantity of
items
included in
product
2
2 (Main
battery and
RTC battery)
1
Page 1

Advertisement

loading

Summary of Contents for HP EliteBook x360 830 G7

  • Page 1 Marketing Name / Model [List multiple models if applicable.] HP EliteBook x360 830 G7 Notebook PC HP EliteBook x360 830 G7 Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for the disassembly of HPI products to remove components and materials requiring selective treatment, as defined by EU directive 2012/19/EC, Waste Electrical and Electronic Equipment (WEEE).
  • Page 2 Quantity of items Item Description Notes included in product weighing > 25 grams (not including PCBs or PCAs already listed as a separate item above) Components and parts containing toner and ink, Include the cartridges, print heads, tubes, vent including liquids, semi-liquids (gel/paste) and toner chambers, and service stations.
  • Page 3 3.2 Optional Graphic. If the disassembly process is complex, insert a graphic illustration below to identify the items contained in the product that require selective treatment (with descriptions and arrows identifying locations). EL-MF877-00 Page 3 Template Revision C Last revalidation date 09-May-2018 HPI instructions for this template are available at EL-MF877-01...
  • Page 4 MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY MODEL : Oleander Sub-assembly name: Oleander Disassemble SOP Document No.: Oleander Disassemble SOP Written by: Revision: 1.00 Yi qiu-ling 1 of 25 Date: 2020/3/21 Page: A.Current station version list: Sta. Ver. Sta. Ver. Sta. Ver. Sta.
  • Page 5 Standard Operation Procedure 1(1/1) Document No. : Oleander Disassemble SOP Station : Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassembly Base step: 1. Loosen Base screw *5pcs as below picture showing ❖ Torque:2.5 ±0.2 kgf.cm ❖ screw can not be slipped. 2.
  • Page 6 Standard Operation Procedure 2(1/1) Document No. : Oleander Disassemble SOP Station : Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassembly SSD Shielding Can step: 1. Disassemble battery CNTR(picture 1) 2. Disassemble SSD Shielding Can(6053B1743801) (picture 2) ❖pull shielding can remove the handle is on the right Picture 1 Picture 2...
  • Page 7 Standard Operation Procedure 3(1/1) Document No. : Oleander Disassemble SOP Station : Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassemble DDR step: 1. Disassemble DDR Shielding Can(6053B1744001) (picture1) ❖pull shielding can the right handle lift unloading 2. Take DDR(picture 2) Picture 1 Picture 2 Notice: Please inform production line leader or master if you found any abnormal..
  • Page 8 Standard Operation Procedure 4(1/1) Document No. : Oleander Disassemble SOP Station : Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassemble LCM&camera CNTR step: 1. Hold the Camera Cable handle,and unplug the CNTR(picture1) 2. Hold the LCM Cable handle,and unplug the CNTR (picture2)...
  • Page 9 Standard Operation Procedure 5(1/1) Document No. : Oleander Disassemble SOP Station : Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassemble WWAN antenna step: 1. Unplug all antenna CNTR on WWAN card and tie the antenna out of the antenna slot(picture1)...
  • Page 10 Standard Operation Procedure 6(1/1) Document No. : Oleander Disassemble SOP Station : Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Remove the 7and8 antennas step: 1. Remove the 7 and 8 antennas from the I/O frame and speaker(picture) picture1 Notice: Please inform production line leader or master if you found any abnormal..
  • Page 11 Standard Operation Procedure 7(1/1) Document No. : Oleander Disassemble SOP Station : Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassemble WWAN 7and8 step: 1. Remove the aluminum foil of no.7and8 antenna from the battery 2. Remove the antenna from the top AUX3 picture1 picture2...
  • Page 12 Standard Operation Procedure 8(1/1) Document No. : Oleander Disassemble SOP Station : Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassemble battery step: 1. Disassemble screw M2.0*4.0(6052B0081901)*4(picture2) ❖ Torque:1.5 ±0.2 kgf.cm ❖ screw can not be slipped. 2. Disassemble battery(picture2) picture1 picture2 Notice: Please inform production line leader or master if you found any abnormal..
  • Page 13 Standard Operation Procedure 9(1/1) Document No. : Oleander Disassemble SOP Station : Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassemble WLAN antenna step: 1. Remove WLAN CNTR,and find out from the fan hook(picture1) picture1 Notice: Please inform production line leader or master if you found any abnormal.. Fixture list (Spec.) Symbol Hear...
  • Page 14 Standard Operation Procedure 10(1/1) Document No. : Oleander Disassemble SOP Station : Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Remove FFC step: 1. Open CNTR,remove Click Pad FFC (picture1) 2. Open CNTR,remove Smart card FFC (picture1) 3. Open CNTR,remove Backlight FFC (picture3)...
  • Page 15 Standard Operation Procedure 11(1/1) Document No. : Oleander Disassemble SOP Station : Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassemble small battery step: 1. Open CNTR,and take out Finger print FFC(picture1) 2. Open CNTR,and take out NFC CNTR( picture2)...
  • Page 16 Standard Operation Procedure Document No. : Oleander Disassemble SOP Station : 12(1/1) Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Remove NFC step: 1. Take the NFC group down picture1 Module 天線軟板 picture2 Notice: Please inform production line leader or master if you found any abnormal.. Fixture list (Spec.) Symbol Hear...
  • Page 17 Standard Operation Procedure 13(1/1) Document No. : Oleander Disassemble SOP Station : Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassemble Hinge up step: 1. Will hinge up to 270 degrees 2. Remove screw M2.0*5.0(6052A0003501)*6 (picture1) ❖ Torque:2.5 ±0.2 kgf.cm ❖...
  • Page 18 Standard Operation Procedure 14(1/1) Document No. : Oleander Disassemble SOP Station : Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassemble SSD & WLAN&WWAN step: 1. Disassemble screwM2.0*2.0(6052B0388301)*3 ❖ Torque:1.5 ±0.2 kgf.cm ❖ screw can not be slipped. 2.Remove SSD/WLAN /WWAN Module(picture1) 图一...
  • Page 19 Standard Operation Procedure 15(1/1) Document No. : Oleander Disassemble SOP Station : Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassemble USB Bracket step: 1. Remove screw M2.0*4.0(6052B0081901)*4 (picture1) ❖ Torque:1.5 ±0.2 kgf.cm ❖ screw can not be slipped. 2.
  • Page 20 Standard Operation Procedure 16(1/1) Document No. : Oleander Disassemble SOP Station : Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassemble IO Frame step: 1. Remove screw M2.0*4.0(6052B0081901)*5 (图一) ❖ Torque:1.5 ±0.2 kgf.cm ❖ screw can not be slipped. 2.
  • Page 21 Standard Operation Procedure 17(1/1) Document No. : Oleander Disassemble SOP Station : Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassemble FAN step: 1. Remove SET screw *2(picture2) ❖ Torque:1.5 ±0.2 kgf.cm ❖ screw can not be slipped. 2.
  • Page 22 Standard Operation Procedure 18(1/1) Document No. : Oleander Disassemble SOP Station : Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassemble thermal module step: 1. Remove SET screw*4(picture1) ❖ Torque:1.5 ±0.2 kgf.cm ❖ screw can not be slipped. 2.
  • Page 23 Standard Operation Procedure 19(1/1) Document No. : Oleander Disassemble SOP Station : Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassemble MB step: 1. Remove M/B screwM2.0*2.0(6052B0388301)*2 (picture1) ❖ Torque:1.5 ±0.2 kgf.cm ❖ screw can not be slipped. 2.
  • Page 24 Standard Operation Procedure Document No. : Oleander Disassemble SOP Station : 20(1/1) Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassemble Smartcard/B or Dummy step: For Smart Card SKU (picture1) 1. Remove screw M2.0*2.0*D5 (6052B0388301)*3 ❖ Torque:1.5 ± 0.2 kgf.cm ❖...
  • Page 25 Standard Operation Procedure 重点站 21(1/1) Document No. : Oleander Disassemble SOP Station : Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassemble Finger Print and Dummy step: For FPR Module 1. Remove screw M2.0*1.5 D4 (6052B0324501) *1 ❖ Torque:1.5 ± 0.2 kgf.cm ❖...
  • Page 26 Standard Operation Procedure Document No. : Oleander Disassemble SOP Station : 22(1/1) Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassemble right speaker step: 1.Tear off the stationary speaker cable Mylar,and remove speaker Tear off MYLAR Tear off MYLAR picture1 Notice: Please inform production line leader or master if you found any abnormal..
  • Page 27 Standard Operation Procedure Document No. : Oleander Disassemble SOP Station : 23(1/1) Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassemble left speaker step: 1. 1.Tear off the stationary speaker cable Mylar,and remove speaker Tear off Tear off MYLAR MYLAR picture1...
  • Page 28 Standard Operation Procedure 24(1/1) Document No. : Oleander Disassemble SOP Station : Operation Name : Ver. : 1.00 Edit date : 2020/3/21 Disassemble click pad step: 1.Remove Click Pad screwM1.6*1.8(6052B0508901)*6 2.Remove click pad ❖ Torque:1.5 ±0.2 kgf.cm ❖ screw can not be slipped picture1 Notice: Please inform production line leader or master if you found any abnormal..