GE Monogram ZWVS1000SR Installation Instructions Manual page 12

Wine vault
Hide thumbs Also See for Monogram ZWVS1000SR:
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS
ASSEMBLE WALL AND CEILING PANELS
Step 6:
Set the 34-1/2" panel into base
channel. Then install the opposite
rear corner panel. Use the hex key
to securely lock the panels together.
Step 7:
Set the other 23" wide panel into
the channel into the channel. Lock
the side panel to the corner panel.
Place the rear (35") ceiling panel
over the top of the walls. Align the
ceiling panel with the rear and side
walls. The ceiling panel will help to
stabilize the structure during the
rest of the assembly. DO NOT LOCK
THE CEILING PANEL LATCHES AT
THIS TIME.
12
34
1
"
46" wide
2
wide
panel
panel
23" wide
panel
23" wide
panel

Advertisement

Table of Contents
loading

This manual is also suitable for:

Monogram zwvt1000sr

Table of Contents