Newly Rebuilt Engine - Volvo TAD1240GE Operator's Manual

Generating set and industrial engines 12 litre (edc iii)
Table of Contents

Advertisement

Every 800th operational hour / at least every 12th month
Charge air pipes, check for leaks ................................................................... page 22
Fuel pre-filter, change filter element ............................................................... page 37
Fuel filter, change .......................................................................................... page 36
Fuel system, purging ..................................................................................... page 38
Fuel pre-filter. Check .................................................................................. not shown
Every 1000 operational hours / at least every 6th month
1)
Coolant filter, change
1)
Not concurrent with the change of coolant.
Every 2000 operational hours
Turbocharger, check .................................................................................. not shown
Valve play, check/adjust ............................................................................ not shown
Coolant, change (Anti-corrosive liquid) ................................................... pages 29–32
Every 12th month
EDC system. Check with diagnosis tool .................................................... not shown
Engine, general check ................................................................................ not shown
Air filter element, change ............................................................................... page 25
Engine, cleaning/painting ........................................................................... not shown
Air Filter, tank ventilation, change. ............................................................. not shown
Air filter, air compressor, change. .............................................................. not shown
Every 48th month or every 10,000 operational hours
Cooling system, check/flush .................................................................... page 31, 33
Coolant (Glycol mixture), change ........................................................... pages 29–32

Newly rebuilt engine:

After the first 250 hours of operation
Valve play, adjust ...................................................................................... not shown
.................................................................................. page 34
Maintenance
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tad1241geTad1241veTad1242geTad1242veTwd1240ve

Table of Contents