Page 2
Skill Level — Installation of this appliance requires AVERTISSEMENT basic mechanical and electrical skills. Completion Time — 1 to 3 Hours. is not covered under the warranty. monogram.com. accidentelle. S’il n’est pas possible de verrouiller le monogram.ca monogram.com/use-and-care/parts. CAUTION wiring must be done by qualified person(s). In...
Page 3
Design Information CONTENTS Design Information Installation Instructions ......3–4 ................4 ........Installation Preparation ..............................5 ......................5 ........... 11 ......................11 Tools and Materials Required.................... 11 ................... 11 Check Installation Hardware..................PRODUCT DIMENSIONS AND CLEARANCES 36"...
Page 4
Design Information PRODUCT DIMENSIONS AND OPTIONAL ACCESSORIES CLEARANCES (Cont.) Using Duct Cover Accessories Using Duct Cover Accessories to 14 ft. hood installation height. Use this chart to determine Order the optional duct cover at the same time as the installation height and accessory for your ceiling vent hood and have on site before installation.
Page 5
The hood must be secured to air system in accordance with local building code requirements. Visit Monogram.com for available makeup air solutions. cover be on site before final framing and wall finishing. This will also help to accurately locate the ductwork...
Page 6
(replacement) air system in accordance with local building code requirements. length of duct pieces are based on actual tests conducted by Visit Monogram.com for available Total Duct Run good venting performance with any ventilation hood. makeup air solutions.
Page 7
Installation Preparation TOOLS AND MATERIALS REQUIRED (NOT SUPPLIED) grounded branch circuit REMOVE THE PACKAGING The hood is shipped secured to a shipping board with (4) screws. Remove the 4 screws. Two screws are located at the top of the hood. Two are located at the bottom of the hood behind the grease filters.
Page 8
Installation Preparation CHECK INSTALLATION HARDWARE DUCTWORK, WIRING LOCATIONS hood and check contents. recommended space) from the cooking surface to the bottom of the hood. Mark that location. – Use a level to draw a straight pencil line on the wall. Screws FOR CEILING 6-1/4"...
Page 9
Installation Instructions INSTALL FRAMING FOR HOOD INSTALL MOUNTING BRACKET SUPPORT This vent hood must be secured to the horizontal support or wall studs. IMPORTANT: Framing must be capable of supporting 100 lbs. mark all mounting screw locations. 8" Min. Opening for Ductwork View From Rear Cleats horizontal support.
Page 10
Installation Instructions 4 INSTALL THE HOOD 5 CONNECT DUCTWORK center. airflow as illustrated. duct stops. brackets. 2. Mark the 2 lower mounting holes. 3. Remove the hood from the wall. seal. 4. Drill a pilot hole in each lower mounting hole location.
Page 11
Installation Instructions 6 CONNECT ELECTRICAL 8 CONNECT ELECTRICAL WARNING If house wiring is not 2-wire with aluminum-to-copper connectors. AVERTISSEMENT Si la maison n’est pas câblee avec d’utiliser des connecteurs aluminium à cuivre avec une pâte Lift the filter and pull the knob forward until the filter rests on the slots.
Page 12
NOTE: safety glasses or goggles should be worn. ® monogram.com. NOTE: specifications are subject to change without notice. 31-14900 Rev. 3 10-19 GEA Printed in Italy...
Need help?
Do you have a question about the ZV950 Series and is the answer not in the manual?
Questions and answers