• Less charging cycle, is favourable for the life span
• Reduces water consumption
Charge the batteries every time after using and then at least once a month
regardless of use with a suitable charger!! Prevent deep discharge batteries, this
gives severe damage and a shorter lifetime!!
See also the instructions in Appendix 3 battery safety sheet!
9.9

Pipe rail system maintenance

The pipe rail system on which the METO-SWT runs should be checked on a regular basis.
The system should always satisfy the Horticulture Sector Guidelines for Pipe Rail Systems
in greenhouses (see 7.2). It is prohibited to use the Pipe rail wagon on a pipe rail system
that does not satisfy these guidelines. The employer is also responsible for periodically
checking tools and equipment according to the current Working Equipment Guidelines
that cover this.
Ensure that all the pipes have sufficient support with a maximum separation distance of
1.25 m in between and that the supports are not out of line with respect to the pipes.
Moreover, the pipes on the concrete path should be secured and must not be loose. At
the pipe ends (in front of the wall) there should be an end-stop welded on that is at least 5
cm high - at the end of each season check whether the stops are still functioning properly.
The ground under the pipe rail system should be dry, flat and hard. Soft or damp spots
should be repaired and surface indentations permanently repaired.
Translated user manual V3_EN
METO-SWT 7030.XX.XXXX