Download Print this page

Site Preparation - Kohler FLEUR WATERGUARD K-3417 AA Series Installation Instructions Manual

Vitreous china toilet

Advertisement

2. SITE PREPARATION

REMOVE EXISTING TOILET
NOTE: Carefully inspect new fixture for any sign of dam-
age before removing existing toilet.
Turn off water supply.
Flush the toilet and sponge out remaining water from tank
and bowl.
Disconnect supply valve and remove old tank and bowl.
Remove old gasket from the floor and closet flange with
a putty knife.
Remove old T-bolts (the T-shaped bolts in the closet
flange) and discard.
CAUTION: Risk of hazardous gases. If new toilet
is not installed immediately, temporarily stuff a rag
in the closet flange.
ROUGH-IN PLUMBING
Turn off water supply.
Install or relocate supplies and outlets as necessary to
conform to roughing-in dimensions. See Fig. #2. For
shut-off valve location, see Fig. #3.
ROUGHING-IN DIMENSIONS
1"
27-1/2"
3-5/8"
12"
AA
112363–2–
(0793)
29-5/8"
14-1/8"
C OF OUTLET
L
3/8" I.P.S. SUPPLY
19-1/4"
5-1/8"
Fig. #2
2
Closet Flange
Fig. #1
FRONT OF BOWL
13-7/8"
6-1/8"
9-1/2"
K-4227 BASE
Kohler Co., Kohler, WI

Advertisement

loading