Prepare The Site - Kohler MODERN LIFE K-21841T Installation Instructions Manual

Table of Contents

Advertisement

PREPARE THE SITE

PREPARE THE SITE
NOTE:
If a pre-existing waste pipe will be used and will result
in an acceptable rim height (refer to the rough-in dimensions),
follow the retrofit installation instructions.
For Retrofit Installations
!
Turn the water supply line off, remove the existing urinal,
then cap off the water supply line inside the wall.
For New Installations
!
Install waste pipe as necessary to conform to the
roughing-in dimensions.
!
Install adequate support framing for the hangers as
needed.
No object within 800mm of the
width of the sensor bilateral symmetry
Electronic Components Installation
Electronic Components Installation
Electronic components are pre-installed in factory.
1323700-T01-B
450
Clapboard suggest
reference length is 450mm
1500
No objects in the
Sensor before
1500mm
1500mm
800mm
800
Fig.2a
2a
)
!
!
!
Drain Connection
450mm
No objects in the
Sensor before
1000mm
1000mm
No object within 800mm of the
width of the sensor bilateral symmetry
800mm
Fig.2b
-4-
Wall
Wall Hangers
450
Clapboard suggest
reference length is 450mm
1000
800
2b
(
450mm

Advertisement

Table of Contents
loading

Table of Contents