Inspecting And Handling The Unit - Daikin VRV II Series Design, Installation & Testing Instructions

Hide thumbs Also See for VRV II Series:
Table of Contents

Advertisement

Inspecting and Handling the Unit

4. Inspecting and Handling the Unit

At delivery, the package should be checked and any damage should be reported immediately to
the carrier claims agent.
When handling the unit, take into account the following:
1.
2. Choose the path along which the unit is to be brought in ahead of time.
3. If a forklift it to be used, pass the forklift arms through the large openings on the bottom of
4. Lift the unit preferably with a crane and 2 belts of at least 8m long.
5. When lifting the unit with a crane, always use protectors to prevent belt damage and pay
6. After installation, remove the transport clasps attached to the large openings.
7. Bring the unit as close to its final installation position in its original package to prevent
164
Fragile, handle the unit with care.
Keep the unit upright in order to avoid compressor damage.
the unit.
attention to the position of the unit's centre of gravity.
damage during transport.
RXYQ5 . 8 . 10 type
RXYQ5 type
1
3
2
RXYQ12 . 14 . 16 type
RXYQ8 . 10 type
1
1
2
1.Packaging material
2.Forklift
3.Opening (Large)
4.Belt sling
5.Opening (Small) (40×30)
6.Wear plate
7.Removal of shipping brackets
8.Shipping bracket (Remove the screws.)
RXYQ12 . 14 . 16 type
4
4
6
3
<
>
7
4
8
6
5
3
4
4
6
Installation Manual
Si39-303

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents