SUN2000-(2KTL-5KTL)-L1
User Manual
7.1.3 Creating a PV Plant and a User
Figure 7-4 Creating a PV plant and a user
7.1.4 (Optional) Setting the Physical Layout of the Smart PV
Optimizers
Issue 01 (2020-04-17)
For details about how to use the site deployment wizard, see
also scan the QR code to obtain the document.
If smart PV optimizers are configured for PV strings, ensure that the smart PV optimizers have been
successfully connected to the SUN2000 before performing the operations in this section.
Check that the SN labels of smart PV optimizers are correctly attached to the physical layout
template.
Take and save a photo of the physical layout template. Keep your phone parallel to the template and
take a photo in landscape mode. Ensure that the four positioning points in the corners are in the
frame. Ensure that each QR code is attached within the frame.
For details about the physical layout of smart PV optimizers, see
can also scan the QR code to obtain the document.
Copyright © Huawei Technologies Co., Ltd.
7 Man-Machine Interaction
FusionSolar App Quick
Guide. You can
FusionSolar App Quick
Guide. You
63