Matsing MS-MBA-2-L2 Instruction Manual

Advertisement

Quick Links

30 Apr 2019
INSTRUCTION MANUAL MS-MBA-2-L2
TABLE OF CONTENTS:
1.00
BEAMS & CONNECTORS:
1.10
Resultant Beam Layout-Plan View
1.20
LB Connector
1.30
Connector Layout
1.40
Connector Ports Table
2.00
2.10
Low Band
3.00
4.00
Bracket, BOLT & NUTS REQUIREMENT
4.10
Bolts & Nuts
4.20
Bracket
4.30
5.00
5.10
5.20
Revision History:
Date
email:
info@matsing.com
MBA-2-L2
Date
Prepared by
Ray Ling
Description
website:
Instruction Manual
Approved by
Patrick Yeo
MS-MBA-2-L2-IM-001
www.matsing.com
Document nos
Revision
Revision
Revised by
nos.
Page
1
0
/
4

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MS-MBA-2-L2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Matsing MS-MBA-2-L2

  • Page 1 Instruction Manual Date Prepared by Approved by Document nos Revision 30 Apr 2019 Ray Ling Patrick Yeo MS-MBA-2-L2-IM-001 INSTRUCTION MANUAL MS-MBA-2-L2 TABLE OF CONTENTS: 1.00 BEAMS & CONNECTORS: 1.10 Resultant Beam Layout-Plan View 1.20 LB Connector 1.30 Connector Layout 1.40 Connector Ports Table 2.00...
  • Page 2 1.00 BEAMS & CONNECTORS: 1.10 Resultant Beam Layout-Plan View 1.30 Connector Layout 1.20 1.40 LB Connector Connector Ports Table Page...
  • Page 3 2.00 PATTERN DIAGRAM 2.10 Low Band 3.00 MANUAL TILT ADJUSTMENT The MBA antenna come in RET mode as default, but if needed can also be manually adjusted. To do so, please unscrew the waterproof cap behind the element whose tilt is to be adjusted. By Default the knob is on engaged mode, pull out the handle for manual tilt adjustment, turn the handle to change the tilt.
  • Page 4 4.00 BRACKET, BOLT & NUTS REQUIREMENT Bracket Model Apply Bolt Size/Qty Nuts Size/ Qty Qty (pc) MBA-2, MBA-8, MBA-3-H4, M12 x 160mm/4pcs M12/8pcs MBA-3.2-H4-L4, MBA-2-L2, 6SH-LAA 4.10 Bolts & Nuts 4.20 Bracket 4.30 Installation Sample (MBA Model's mostly identical installation) BEFORE INSTALLED AFTER INSTALLED AFTER INSTALLED...

Table of Contents